Pre-Construction Baseline: your site on record
Pre-construction documentation of roads, curbs and site conditions, on record before you mobilize.

What goes on record
- Exterior conditions
- Roads, curbs, sidewalks, drainage, fencing, neighbors.
- Site context
- Access routes, laydown areas, existing grades.
- Metadata
- Date, time, position and aircraft on every capture.
- Interior conditions
- A separate walk-through record. See Interior Documentation.
Severance Library
After construction, the City of Severance claimed $80,000 in road damage. The baseline showed which damage was already there.
$40,000
Paid by the GC
$40,000
Paid by the city
$80,000
What you get
- Orthomosaic
- GeoTIFF for CAD and GIS overlay.
- Photo inventory
- Timestamped, GPS-tagged, filed by location.
- 3D model
- Point cloud you can review in a browser.
- Summary report
- PDF with key images and the metadata log.
Before you scope it
Writing an RFP? Read the checklist.
- When should the baseline be flown?
- Before mobilization. The record has to exist before the crews do.
- Is this a land survey?
- No. Boundaries and certified design need a Licensed Professional Land Surveyor.
- How fast is delivery?
- 24 to 48 hours from flight to data.
Stop guessing. Start documenting.