Pre-Construction Baseline: your site on record

Pre-construction documentation of roads, curbs and site conditions, on record before you mobilize.

Orthomosaic of the Severance Library site as an empty lot beside the existing building, before mobilization
Severance Library, before mobilization

What goes on record

Exterior conditions
Roads, curbs, sidewalks, drainage, fencing, neighbors.
Site context
Access routes, laydown areas, existing grades.
Metadata
Date, time, position and aircraft on every capture.
Interior conditions
A separate walk-through record. See Interior Documentation.

Severance Library

After construction, the City of Severance claimed $80,000 in road damage. The baseline showed which damage was already there.

$40,000

Paid by the GC

$40,000

Paid by the city

$80,000

Read the Severance case

What you get

Orthomosaic
GeoTIFF for CAD and GIS overlay.
Photo inventory
Timestamped, GPS-tagged, filed by location.
3D model
Point cloud you can review in a browser.
Summary report
PDF with key images and the metadata log.

Before you scope it

Writing an RFP? Read the checklist.

When should the baseline be flown?
Before mobilization. The record has to exist before the crews do.
Is this a land survey?
No. Boundaries and certified design need a Licensed Professional Land Surveyor.
How fast is delivery?
24 to 48 hours from flight to data.

Stop guessing. Start documenting.

Every job is different

Send the address, start date and scope.

Pilot

FAA Part 107, insured